USPS Facility Infrastructure & EV Integration | Clovis, CA
Clovis, CA
Black calendar icon with two tabs at the top and six date squares inside

Project Duration

June 27, 2025
Thin black horizontal line on a white background.
March 11, 2026
Black location pin over a folded map icon

Location

Clovis, CA
Black checkmark inside a circle icon on a white background

Type

Commercial

Project Overview


Spanning from June 2025 to March 2026, Vine Electric spearheaded a comprehensive electrical modernization project for the USPS facility in Clovis, CA. This project required precise coordination to integrate modern EVSE (Electric Vehicle Supply Equipment) and high-efficiency lighting systems while ensuring the facility remained fully operational and compliant with rigorous safety standards.

USPS Facility Infrastructure & EV Integration | Clovis, CA

Project Scope


  • EV Charger Infrastructure & Installation: We engineered and installed the mission-critical electrical infrastructure required for the facility's new EV charging stations. This included managing equipment feeds and final connections to ensure a seamless, code-compliant rollout of the station’s power supply.
  • Modernized Exterior Site Lighting: To enhance security and visibility for the USPS fleet and staff, we furnished and installed new exterior light poles. Our team managed the entire process, from the structural integrity of the pole bases to the final electrical terminations and site lighting design integration.
  • Underground Electrical Distribution: A major phase of this project involved complex underground work. We executed precision trenching and created dedicated conduit pathways, installing high-capacity conductors to provide a reliable power backbone for both the site lighting and the EV charging network.
  • Interior LED Lighting Retrofit: We performed a comprehensive interior lighting overhaul aimed at reducing energy overhead and improving clerk visibility. By retrofitting existing fixtures with high-efficiency technology, we achieved superior performance while maintaining a safe, active work environment for postal operations.

Our Approach to Every Project

Outlined document stack with lightbulb icon, suggesting ideas or content planning

Strategic Planning

Comprehensive planning that aligns infrastructure with project goals, future expansion, energy efficiency, and long-term operational needs.

Presenter pointing at strategy diagram on easel with Xs and Os

Quality & Safety

High-quality workmanship performed with strict safety standards and full compliance with electrical codes and regulations.

Handshake icon with three stars above it, in black and white.

Transparent Partnership

Clear communication, proactive project management, and close collaboration from project kickoff through final completion.

Featured Commercial Projects

Commercial Facility Infrastructure & Lighting Upgrade
Commercial Facility Infrastructure & Lighting Upgrade
Berkeley, CA
USPS Facility Infrastructure & EV Integration | Clovis, CA
USPS Facility Infrastructure & EV Integration | Clovis, CA
Clovis, CA